Meta said the 1GW facility will use a closed-loop liquid cooling system with dry cooling, requiring no operational water for cooling.
Meta to Build First Canadian C$13 billion Data Centre as AI Infrastructure Demand Grows
Meta said the 1GW facility will use a closed-loop liquid cooling system with dry cooling, requiring no operational water for cooling.