Meta said the 1GW facility will use a closed-loop liquid cooling system with dry cooling, requiring no operational water for cooling.
Meta to Build First Canadian C$13 billion Data Centre as AI Infrastructure Demand Grows
Meta said the 1GW facility will use a closed-loop liquid cooling system with dry cooling, requiring no operational water for cooling.
He Watched His College Run Out of Water. Now He Wants Data Centres to Make It.
A profile on Uravu Labs CEO Swapnil Shrivastav.
Meta will lease capacity at a new 168 MW AI-enabled data centre being developed by Reliance Industries in Jamnagar, Gujarat. The deal marks Meta’s first AI infrastructure footprint in India.